Permitting & Environmental

Our Efforts to Improve the Environment

Eckman Engineering LLC provides Environmental Engineering and Permitting Services aimed at improving the environment (noise, light, water, and/or land resources) around New England. This includes erosion control, sediment control, and wastewater disposal.

Natural resources regulated by Local, State and Federal agencies pose constraints for nearly every development project.

  • Eckman Engineering LLC has extensive experience in identifying these constraints and effectively managing the project design and permitting processes to achieve the desired results in a timely manner.
  • We also maintain knowledge of environmental regulations and ongoing liaison with regulatory agencies so that we can provide clients with up front information on permitting requirements and time frames.

CONTACT US

PHONE: (603) 433-1354

Areas of Expertise

Our professionals are qualified to serve you in a wide range of regulatory interpretations and compliances with the requirements of NHDES, Stormwater and other local, state, and federal regulations. We are recognized for starting and completing projects on schedule, quality, safety records, professionalism and for protecting our clients from violations by performing all work in accordance with regulatory requirements.

Our Permitting & Environmental Services

  • Permitting
  • Erosion and Sediment Control Plan- SWPPP
  • Shoreland Protection Permitting (State and Local)
  • Subdivision (State and Local)
  • Sub-Surface Disposal Systems
  • Low Impact Design
  • Water Quality
  • Erosion Control Monitoring
  • NHDES Wetlands Bureau Permitting
  • NHDES Wetland Restoration Plans
  • Driveway Permits (State and Local)
  • Alterations of Terrain
  • Sewer Discharge Permits
  • EPA General Permitting (SWPPP, NOI)
  • Army Corps of Engineers Permitting
  • Site Assessment Studies
  • Comprehensive Shoreland Protection Agency Permitting
  • Planning Board (Subdivisions, Site Plans, Waivers)
  • Zoning Board of Adjustment
    (Variances and Special Exceptions)
  • Subdivision Approval NHB
    (National Heritage Bureau Data Check)
  • EPA Phase II
  • Sedimentation Basin Design
  • Sediment Filter Design
  • Dewatering System Design
  • Pile Hammer Selection
  • Pile Design